January 19-24th- Stairs and a floor!

26 2

What a very busy week it has been! 

Patrick and Garrett started the spiral steps that have been in planning mode for several weeks. I’ve been (impatiently) waiting for these steps for two months! The good news is they were completed by the end of the week! YAY! Well done Patrick and Garrett!!

The HRV has been completed with the new design and spacing, utilizing shorter more efficient runs and no crazy huge soffits. I’m grateful for Zehnder’s help with this product. 

The electrical and plumbing rough-in is almost completed. Thanks for Lakeside Plumbing and to Tughan Electric for all of your help!

Check out the floor radiant tubing which has been installed throughout the great room, kitchen, media room, office, spa and powder room. Love the curvy red tube design.  

Met with masons and siding subs to move forward in the very near future.

Check out the photo of me with James and Zachary- my favorite electrician. This job is full of happy people and it shows in the vibe throughout the job. 

Our framers started to install the deck on the master suite and off of the great room. The wood is gorgeous!

Gypcrete was poured at the end of the week to cover the radiant tubes. By the end of the week we had a beautiful floor that even Koko loves to run on.  

Grateful for the work of the whole team!