As you can probably tell from the lack of a weekly update, Iāve been on vacation, but Iām back now. Patrick and Henrick held down the fort and the work continued in our absence. The cooler weather is upon us and the leaves are changing. Itās so very beautiful at the property!
The framing continuesā¦. (ALMOST FINISHED!). The turret framing is completed, the roof sheathing is on and the ice and water shield has been installed too. The roofing membrane (which will be underneath the green live plant roof) is on the curved section of the house is complete- yay! The great room roof isnāt complete yet, but theyāre working on it.
The crew has worked on the sheathing around the house, to prep for the window vapor barrier and window installation to start next week.
Patrick created what looks like a skateboard ramp, which is actually the curve for the swoops for the roof. It looks amazing! Thank you Patrick!
The rock, called Montana Moss, has arrived from Montana. This gorgeous rock will be used around the interior fireplace in the great room, to create the fireplace on the outdoor deck, and for the front of the entryway and it will also cover the turret. I canāt wait to see the exterior of the house once this stone has been applied.
Next week weāll be back with a more detailed update as well as a weekly video. I had planned to do one but my shoot was interrupted by a visit from a large neighborhood dog. Sorry!